Finishing Division Improvement
Phase One of a Five Year Expansion
JNE provided basic engineering to define scope, schedule and the project estimate for the finishing division upgrade, followed by multi-discipline construction engineering to support the construction effort. Services included engineering project management, civil/structural, electrical, mechanical, piping and HVAC (building services) and design control.
In addition to the basic engineering and construction engineering efforts, JNE also provided project management and construction management supporting services including estimating, construction trade coordination and Quality Assurance/Quality Control(QA/QC).
No. 1 CPCM
Phase One of the program consisted of the following:
No. 2 CPCM
The No. 2 CPCM project involved the installation of a new continuous pickle line coupled with an existing cold mill. The work included:
The new acid regeneration plant replaced the two existing plants with additional capacity. The technology that has been adopted is a fluidized bed system where the waste pickle liquor is regenerated and returned to the pickle lines, while the residue is converted into dust-free iron oxide pellets.