News
Understanding Arc Flash Electrical Hazards
Arc flashes, one of the most disastrous and least understood electrical hazards in the workplace, are usually caused by inadvertent contact between an energized conductor with another energized conductor or a grounded surface. These can cause devastating injuries and equipment damage. JNE can provide complete short circuit, arc flash, and relay coordination studies of your facility to help ensure the latest regulations are maintained and employee safety remains a top priority.
Cutting Costs on Cutting and Drilling Fluids Disposal
Cutting and drilling fluids contain a variety of oils and emulsifiers that make wastewater difficult to treat once the fluid is no longer usable. As a result, fluids are often disposed of as hazardous waste, incurring high operating costs to your company. JNE Environmental has developed a process that allows you to treat this wastewater at your own plant, leading to significant cost savings.
Oil Removal Package Optimizes Stamping Plant’s Existing Wastewater Treatment System
A local stamping and manufacturing plant approached JNE Environmental to supplement their existing wastewater treatment system. The existing system was very maintenance intensive due to the high oil content in the wastewater. To reduce the load on the existing system, we custom-designed an oil removal package by combining multiple oil recovery methods.
Pilot Plant Achieves Complete Destruction of Airborne VOC
A customer that makes a resin used in everything from billiard balls to countertops needed help removing high concentrations of volatile organic compounds (VOC) from their air emissions. Using the resources at our Burlington facility, we custom-designed, built, and operated a high-temperature catalytic oxidation Pilot Plant to test its effectiveness in treating hazardous air pollutants.














