News
Control System Testing and Quality Assurance
Are you facing pressure to get a process back up and running within a strict shutdown window? Our specialists have developed standard testing, simulation, and onsite practices that can reduce the risk of delayed start-up and minimize effects on your production schedule.
Cutting Costs on Cutting and Drilling Fluids Disposal
Cutting and drilling fluids contain a variety of oils and emulsifiers that make wastewater difficult to treat once the fluid is no longer usable. As a result, fluids are often disposed of as hazardous waste, incurring high operating costs to your company. JNE Environmental has developed a process that allows you to treat this wastewater at your own plant, leading to significant cost savings.Â
Oil Removal Package Optimizes Stamping Plant’s Existing Wastewater Treatment System
A local stamping and manufacturing plant approached JNE Environmental to supplement their existing wastewater treatment system. The existing system was very maintenance intensive due to the high oil content in the wastewater. To reduce the load on the existing system, we custom-designed an oil removal package by combining multiple oil recovery methods.
Pilot Plant Achieves Complete Destruction of Airborne VOC
A customer that makes a resin used in everything from billiard balls to countertops needed help removing high concentrations of volatile organic compounds (VOC) from their air emissions. Using the resources at our Burlington facility, we custom-designed, built, and operated a high-temperature catalytic oxidation Pilot Plant to test its effectiveness in treating hazardous air pollutants.










