News
McMaster CIVENG2X03 Visit
In early November, JNE hosted a group of students from the McMaster University CIVENG2X03 program to tour 176 Shaw Street and the TCE fabrication shop. A unique aspect of the walkthrough included a visit to our fab shop, which provided the students with a clear and tangible view of the entire steel fabrication process from design to creation.
Control System Testing and Quality Assurance
Are you facing pressure to get a process back up and running within a strict shutdown window? Our specialists have developed standard testing, simulation, and onsite practices that can reduce the risk of delayed start-up and minimize effects on your production schedule.
Deep-Fried Wastewater Treatment
A potato chip manufacturer in the Toronto area approached JNE Environmental to tackle a problem with their oily wastewater. The wastewater from their production lines was packed with starches, fats, oil, and grease; all emulsified with cleaners. This creates a particularly difficult concoction for treatment systems to treat the wastewater to sewer compliance.
Incoming plant power distribution design and upgrades
Looking to expand your plant or replace aging infrastructure? We work with you to ensure your power system is robust, safe, and reliable to help bring your process goals to reality. Through collaboration with process owners, original equipment manufacturers (OEMs), local utility companies (LDCs), and other key stakeholders, our team can gather the appropriate data to model and simulate the behaviour of plant power systems to develop applicable equipment specifications to meet your process needs.














